A small stone temple in Sri Kalahasti, built slowly, paid for by contract work.
complete38%started 2023.02.06running 3.5 years
The drawn record8 frames · 2023.02.06→ 2026.08.21








Oldest firstspacing is proportional to real elapsed time
- 2023.01.24Read the section on plinth mouldings twice and still drew it wrong.
- 2023.01.25Read the section on plinth mouldings twice and still drew it wrong.
- 2023.02.01Mayamata, chapter on proportion. Slower than I expected.
- 2023.02.11On site. Measured the plinth myself rather than trusting the drawing.
- 2023.02.15Marked out the mandapa in lime on the ground. It is smaller than I imagined.
- 2023.02.20Read the section on plinth mouldings twice and still drew it wrong.
- 2023.03.04Nineteen pillars set. The mandapa roof is still open.
- 18 days · no entry2023.03.22Site visit after the rain. Water is finding the north corner.
- 2 months · no entry2023.05.31Stone from Pulivendula arrived a week late. All sound.
- 2 months · no entry2023.08.08Read the section on plinth mouldings twice and still drew it wrong.
- 1 month · no entry2023.09.17Read the section on plinth mouldings twice and still drew it wrong.
- 2023.09.24Argued about the door height and lost, correctly.
- 18 days · no entry2023.10.12Marked out the mandapa in lime on the ground. It is smaller than I imagined.
- 2023.10.22Carried water to the masons. Nothing else useful I could do today.
- 2023.11.02Mayamata, chapter on proportion. Slower than I expected.
- 26 days · no entry2023.11.28Marked out the mandapa in lime on the ground. It is smaller than I imagined.
- 2023.11.30Mayamata, chapter on proportion. Slower than I expected.
- 2023.12.09On site. Measured the plinth myself rather than trusting the drawing.
- 2023.12.13Walked the foundation with the sthapati. Two courses out of level.
- 2023.12.15Read the section on plinth mouldings twice and still drew it wrong.
- 1 month · no entry2024.01.27Site visit after the rain. Water is finding the north corner.
- 2024.02.03Walked the foundation with the sthapati. Two courses out of level.
- 2024.02.10Nineteen pillars set. The mandapa roof is still open.
- 2024.02.21Read the section on plinth mouldings twice and still drew it wrong.
- 2024.02.23Argued about the door height and lost, correctly.
- 18 days · no entry2024.03.12Carried water to the masons. Nothing else useful I could do today.
- 3 months · no entry2024.06.11Ordered the granite for the steps. Paid from this month's invoice.
- 2024.06.21Walked the foundation with the sthapati. Two courses out of level.
- 2024.07.03Walked the foundation with the sthapati. Two courses out of level.
- 2024.07.13Site visit after the rain. Water is finding the north corner.
- 2024.07.19Mayamata, chapter on proportion. Slower than I expected.
- 2024.07.22Read the section on plinth mouldings twice and still drew it wrong.
- 2024.07.24Mayamata, chapter on proportion. Slower than I expected.
- 2024.08.01Read the section on plinth mouldings twice and still drew it wrong.
- 2024.08.05Ordered the granite for the steps. Paid from this month's invoice.
- 2 months · no entry2024.10.19Mayamata, chapter on proportion. Slower than I expected.
- 2024.10.20Argued about the door height and lost, correctly.
- 2024.10.22Nineteen pillars set. The mandapa roof is still open.
- 14 days · no entry2024.11.05On site. Measured the plinth myself rather than trusting the drawing.
- 2024.11.10The sthapati redrew the gopuram proportions in chalk on the floor.
- 14 days · no entry2024.11.24The sthapati redrew the gopuram proportions in chalk on the floor.
- 2024.12.01Read the section on plinth mouldings twice and still drew it wrong.
- 2024.12.03The sthapati redrew the gopuram proportions in chalk on the floor.
- 16 days · no entry2024.12.19The sthapati redrew the gopuram proportions in chalk on the floor.
- 2024.12.26Walked the foundation with the sthapati. Two courses out of level.
- 2024.12.29Read the section on plinth mouldings twice and still drew it wrong.
- 2025.01.10Read the section on plinth mouldings twice and still drew it wrong.
- 2 months · no entry2025.02.27Site visit after the rain. Water is finding the north corner.
- 2025.03.07Ordered the granite for the steps. Paid from this month's invoice.
- 2025.03.15Marked out the mandapa in lime on the ground. It is smaller than I imagined.
- 2025.03.20Read the section on plinth mouldings twice and still drew it wrong.
- 1 month · no entry2025.04.26Read the section on plinth mouldings twice and still drew it wrong.
- 2 months · no entry2025.06.24Site visit after the rain. Water is finding the north corner.
- 2025.06.29Mayamata, chapter on proportion. Slower than I expected.
- 2025.07.06Walked the foundation with the sthapati. Two courses out of level.
- 2 months · no entry2025.09.01Marked out the mandapa in lime on the ground. It is smaller than I imagined.
- 17 days · no entry2025.09.18Argued about the door height and lost, correctly.
- 2025.09.26The sthapati redrew the gopuram proportions in chalk on the floor.
- 2025.09.28Mayamata, chapter on proportion. Slower than I expected.
- 2025.10.08Carried water to the masons. Nothing else useful I could do today.
- 17 days · no entry2025.10.25Read the section on plinth mouldings twice and still drew it wrong.
- 29 days · no entry2025.11.23Walked the foundation with the sthapati. Two courses out of level.
- 2025.11.30On site. Measured the plinth myself rather than trusting the drawing.
- 27 days · no entry2025.12.27Site visit after the rain. Water is finding the north corner.
- 27 days · no entry2026.01.23Mayamata, chapter on proportion. Slower than I expected.
- 18 days · no entry2026.02.10Site visit after the rain. Water is finding the north corner.
- 2026.02.21Mayamata, chapter on proportion. Slower than I expected.
- 18 days · no entry2026.03.11Walked the foundation with the sthapati. Two courses out of level.
- 2026.03.13Argued about the door height and lost, correctly.
- 21 days · no entry2026.04.03Walked the foundation with the sthapati. Two courses out of level.
- 2026.04.11The sthapati redrew the gopuram proportions in chalk on the floor.
- 2026.04.18Mayamata, chapter on proportion. Slower than I expected.
- 15 days · no entry2026.05.03Read the section on plinth mouldings twice and still drew it wrong.
- 2026.05.05Site visit after the rain. Water is finding the north corner.
- 2026.05.06Site visit after the rain. Water is finding the north corner.
- 2026.05.17Carried water to the masons. Nothing else useful I could do today.
- 2026.05.21Argued about the door height and lost, correctly.
- 1 month · no entry2026.06.23Argued about the door height and lost, correctly.
- 2026.06.30Walked the foundation with the sthapati. Two courses out of level.
- 2026.07.04Mayamata, chapter on proportion. Slower than I expected.
- 2026.07.08Read the section on plinth mouldings twice and still drew it wrong.
- 23 days · no entry2026.07.31Marked out the mandapa in lime on the ground. It is smaller than I imagined.
- 2026.08.12Sat with the sthapati over the gopuram proportions. He drew it in chalk on the floor.
- 2026.08.21The stone from Pulivendula arrived a week late. Nineteen pillars, all sound.
- Today · 2026.08.21