Three pursuits, one ledger.
Each has a start year, a state, and a last-touched date. They are not projects — none of them has a deadline I chose.
Temple
2023—runningA small stone temple in Sri Kalahasti, built slowly, paid for by contract work.
Nineteen pillars set, the mandapa roof still open. The kumbhabhishekam date is fixed; everything else moves around it.
38%complete
20232026
84 editions · last touched 2026.08.21running 3.5 yearsPuranas
2024—runningLearning animation well enough that episodes from the Bhagavata can be watched rather than only read.
Seven stories cut, sixty-three seconds finished. Every second costs about forty drawings, and most of them are wrong.
7stories cut
20242026
70 editions · last touched 2026.08.19running 2.3 yearsTrade
2014—runningContract engineering. It funds the other two, and it is the reason the other two are possible at all.
Contract work. Every invoice has a line at the site.
412editions touched
20192026
257 editions · last touched 2026.08.17running 12.1 years